Before you dig: call 811 to have underground utilities marked, and check local permit and HOA rules. Wear gloves, safety glasses, and a dust mask when mixing concrete or drilling.

Step 1: Pour Your Footer

First – Dig the hole

Dig to the size and depth in your footer specifications: 18–24″ deep, 16″ diameter. Pile the soil on a tarp to protect your lawn.

Digging the footer hole with a wheelbarrow nearby

Second – Mix your concrete

Use high-strength concrete mix from any hardware store. About 5-7 bags per footer will be needed. Mix in a wheelbarrow until thick and smooth, with no dry pockets.

Mixing concrete in a wheelbarrow

Finally – Pour and smooth

Fill the hole with concrete and smooth the top. Then choose how to attach your pole below.

Freshly poured and smoothed concrete footer

Step 2: Choose Your Mounting Method

Method A: L-bolts in wet concrete

Set the bolts right after pouring. Best if you want it done in one session.

Freshly poured concrete, still wet

Do this step while the concrete is still freshly poured and wet, before it begins to set.

Freshly poured concrete, still wet

Lay our template on the wet concrete and push an L-bolt through each hole. Keep them aligned with the template, level, and at least 1 inch above the concrete. Don’t disturb them while the footer cures.

Freshly poured concrete, still wet

Method B: Drill and anchor after curing

Use this method for existing concrete

Let the concrete cure fully, then mark and drill. Best if you want to pour first and mount later, or if you’re mounting to an existing concrete patio or slab.

Four drilled holes in cured concrete

Mark the holes with the template and drill each to the length of the anchor, matching the bit to the anchor as shown. Vacuum out the dust.

Four drilled holes in cured concrete

Tap the 4 anchors in with a rubber mallet, leaving at least 1 inch above surface level.

Four drilled holes in cured concrete
Mounting the pole base plate and tightening with a ratchet

Step 3: Mount the pole and tighten

Set the base plate over the bolts, add the washers and nuts, and tighten with a ratchet and 5/8″ socket until the pole is firm and well secured. 

What you’ll need

Shovel/digging tool · Wheelbarrow or mixing tub · Level · Ratchet and socket 5/8″ · Rubber mallet (Method B) · Drill with masonry bit (Method B) · Shop vacuum (Method B) · Gloves, safety glasses, dust mask

Don’t want to pour it yourself?

Hire a local landscaper or contractor to pour the footer using our specifications, or ask about professional installation through our installation partner.

Need Help Getting Started?

Call Shade Sail Systems today and speak with our experienced staff for personalized guidance. We’re here to help you design the perfect, custom-tailored shade solution for your venue—reach out now to learn more and get started!

Contact Us

Get A
Free Quote

Send us your request and let’s achieve more together